E - PAPER

CURRENT MONTH

LAST MONTH

VIEW ALL
  • HOME
  • NEWS ROOM
  • COVER STORY
  • INTERVIEWS
  • DRAWING BOARD
  • PROJECT WATCH
  • SPOTLIGHT
  • BUILDING BLOCKS
  • BRAND SYNC
  • VIDEOS
  • HAPPENINGS
  • E-MAGAZINE
  • EVENTS
search
  1. Home
  2. ALLIED

Construction Bids Invited For Mumbai’s Ramabai Nagar Slum Redevelopment

Construction Bids Invited For Mumbai’s Ramabai Nagar Slum Redevelopment

BY Realty+
Published - Monday, 26 May, 2025
Construction Bids Invited For Mumbai’s Ramabai Nagar Slum Redevelopment

The Mumbai Metropolitan Region Development Authority (MMRDA) has invited construction bids for 5,623 tenements as part of Phase I of the Ramabai Ambedkar Nagar and Kamraj Nagar slum redevelopment project, putting its firstever Slum Rehabilitation Authority (SRA) scheme firmly on track.

The Rs 8,498 crore project aims to transform a 31.83-hectare sprawl in Ghatkopar's Ramabai Ambedkar Nagar and Kamraj Nagar into a planned housing cluster with over 17,000 homes, civic amenities, and a freeway link connecting to Thane. Phase I covers 6.95 hectares and will feature 11 residential towers—up to 70 metres tall—built over a 36-month deadline. This urban renewal marks MMRDA's first independent foray into slum rehabilitation.

An MMRDA official said, "The 5,623 tenements will come with 300 sq ft carpet area units, built across towers with basements for parking, commercial zones at stilt level, and 22 residential floors above."

All towers will be equipped with eight elevators, including stretcher lifts. Amenities like anganwadis, libraries, youth centres, and fitness facilities will be included as per DCPR 2034.

MMRDA officials said the project will be executed with a mix of funding—Rs 3,916 crore through institutional loans and 39% via internal revenue—ensuring both transparency and fiscal discipline.

MMRDA estimates that it will earn Rs 1,073 crore from the sale component of residential tenements if they are built by the development agency. However, it will be able to earn Rs 2,918 crore if the sale component is sold to a developer who will then build and sell his housing stock in the market. The deal will also be financially lucrative for the development agency, which is looking at various options to shore up revenues.

The authority anticipates a three-year timeline to complete the project from the day the land is transferred by the SRA.

RELATED STORY VIEW MORE

JSW One Becomes India’s Largest Steel-Selling Platform
EPC Firm Tandem Healthcare to Design & Build 500-Bed Hospital in Bengaluru
Autodesk And Anna University MoU to Enhance Student Employability

TOP STORY VIEW MORE

AkzoNobel’s 'Dulux Maestro’ to Empower India’s Designer Community

AkzoNobel’s Dulux Maestro offers early access to innovations, professional collaborations, insights into colour and trends forecasting workshops.

23 May, 2025

Turning Broken Tiles into Art: Somany Ceramics Project with Design Students

23 May, 2025

Next Office Unveils New Brand Identity: Design with Purpose

23 May, 2025

NEWS LETTER

Subscribe for our news letter


E - PAPER


  • CURRENT MONTH

  • LAST MONTH

Subscribe To Realty+ online




Get connected with us on social networks!
ABOUT REALTY+

Started in 2004, Realty+, an exchange4media group publication is one of the most respected real estate magazines in India with offices in Delhi, Mumbai and Bengaluru.

Useful links

HOME

NEWS ROOM

COVER STORY

INTERVIEWS

DRAWING BOARD

PROJECT WATCH

SPOTLIGHT

BUILDING BLOCKS

BRAND SYNC

VIDEOS

HAPPENINGS

E-MAGAZINE

EVENTS

OTHER LINKS

TERMS AND CONDITIONS

PRIVACY-POLICY

COOKIE-POLICY

GDPR-COMPLIANCE

SITE MAP

REFUND POLICY

Contact

Mediasset Holdings 3'rd Floor, D-40, Sector-2, Noida (Uttar Pradesh), Pincode - 201301

tripti@exchange4media.com
realtyplus@exchange4media.com

+91 98200 10226


Copyright © 2024 Mediasset Holdings.
Rental Mobil bandung,Sewa Mobil Bandung, Rental bandung, Sewa Mobil, Jual Mesin Antrian, Harga Mesin Antrian, Mesin Antrian Murah, Jual KIOSK,Mesin Antri, Berita Terkini, Info Bray,Info Tempat Wisata,Portal Berita,Jasa Website