E - PAPER

CURRENT MONTH

LAST MONTH

VIEW ALL
  • HOME
  • NEWS ROOM
  • COVER STORY
  • INTERVIEWS
  • DRAWING BOARD
  • PROJECT WATCH
  • SPOTLIGHT
  • BUILDING BLOCKS
  • BRAND SYNC
  • VIDEOS
  • HAPPENINGS
  • E-MAGAZINE
  • EVENTS
search
  1. Home
  2. News/Views

MahaRERA directs builder to obtain Occupancy Certificate within 3 months or pay fine

The Maharashtra Real Estate Regulatory Authority (MahaRERA) has asked a builder to obtain the occupancy certificate (OC) for his building within three months, or pay an interest amount to a resident of the building who filed the complaint — a significant order for a city where more than 10,000 build

BY admin
Published - Saturday, 13 Oct, 2018
MahaRERA directs builder to obtain Occupancy Certificate within 3 months or pay fine
The Maharashtra Real Estate Regulatory Authority (MahaRERA) has asked a builder to obtain the occupancy certificate (OC) for his building within three months, or pay an interest amount to a resident of the building who filed the complaint — a significant order for a city where more than 10,000 buildings do not have the certificates. The certificate is proof that the building was constructed without breaking any rules and building codes. In its absence, residents have to pay double the charges for basic amenities such as water and face hurdles if the structure goes for redevelopment . MahaRERA, the state’s real estate regulator, was hearing a complaint filed by flat owner Amol Sadashiv Jadhav, against Balkrishna Constructions for not getting an OC for the building named ‘Rohini Niwas’ at Vikhroli. Jadhav said the builder had given him possession of the flat in November 23, 2012, but without the OC. Six years later, the builder is yet to obtain the certificate. Jadhav pointed out how the poor water connection, non-existent fire-fighting systems and lifts were causing him mental trauma. The builder blamed the delay in getting the certificate on a policy change under the Development Control Regulations (DCR), but said he intenteded to obtain it within the next six months. He said he would give the reasidents a permanent water connection after that. The MahaRERA, however, said the builder was liable to obtain an OC within a stipulated time.  

RELATED STORY VIEW MORE

UrbanWrk Aims Doubling Stellar FY 2024 127% Revenue Increase
Amid Global Tensions Real Estate Maintains Cautious Optimism
Listed Developers Hold Larger Residential Market Share

TOP STORY VIEW MORE

“Boycott Turkey” Heats Up at Mumbai Airport

Does Shiv Sena’s Ultimatum to Mumbai Airport Over Turkish Firm Signal Deepening Impact of #BoycottTurkey Movement?

15 May, 2025

How AI is Transforming Retail Globally

15 May, 2025

How Technology Is Shaping Indian Warehousing

15 May, 2025

NEWS LETTER

Subscribe for our news letter


E - PAPER


  • CURRENT MONTH

  • LAST MONTH

Subscribe To Realty+ online




Get connected with us on social networks!
ABOUT REALTY+

Started in 2004, Realty+, an exchange4media group publication is one of the most respected real estate magazines in India with offices in Delhi, Mumbai and Bengaluru.

Useful links

HOME

NEWS ROOM

COVER STORY

INTERVIEWS

DRAWING BOARD

PROJECT WATCH

SPOTLIGHT

BUILDING BLOCKS

BRAND SYNC

VIDEOS

HAPPENINGS

E-MAGAZINE

EVENTS

OTHER LINKS

TERMS AND CONDITIONS

PRIVACY-POLICY

COOKIE-POLICY

GDPR-COMPLIANCE

SITE MAP

REFUND POLICY

Contact

Mediasset Holdings 3'rd Floor, D-40, Sector-2, Noida (Uttar Pradesh), Pincode - 201301

tripti@exchange4media.com
realtyplus@exchange4media.com

+91 98200 10226


Copyright © 2024 Mediasset Holdings.
Rental Mobil bandung,Sewa Mobil Bandung, Rental bandung, Sewa Mobil, Jual Mesin Antrian, Harga Mesin Antrian, Mesin Antrian Murah, Jual KIOSK,Mesin Antri, Berita Terkini, Info Bray,Info Tempat Wisata,Portal Berita,Jasa Website