Buro Happold is a multi-disciplinary engineering consultancy company that started in the year 1976 in UK. The company has offices across the globe and its first project in India was the Sahara Stadium. In 2008 starting from a small set-up in Pune, the company next year shifted base to Mumbai.
That was also the time when the scales of projects in India were growing horizontally as well as going vertical. Most of these complex projects are associated with international architects and engineers. Evidently, in terms of providing skills to the building industry, the global exposure has brought forth a transformation in the Indian real estate.
Taller the building higher is the cost to build and operate the building. Rom a developer’s perspective for a tall building, it is important that the income meets cost.
Key drivers for efficiency in tall buildings
Tall buildings house a large numbers of occupants, consumes huge amount of energy and water and generates large amount of waste. Irrespective of plan, shape and location, it can be said that construction and operating cost for high rise buildings increases significantly with increase in height.
The Plant Strategy:The spatial efficiency is linked to vertical distribution and plant floor locations.The building core contains the vertical distribution of MEP/Building Services system throughout the building. Optimizing the cores & risers and maximizing net to gross floor areas increases efficiency. .
In general, increasing the number of floors between technical plant spaces will increase the size of distribution risers. This is because the services running through the risers at each floor level are required to serve a greater number of floors.
Defining a plant distribution strategy therefore becomes a balance between how much floor area is lost to become technical plant space and how much of each occupied floor level is lost to the risers required for services. The efficient plant distribution strategy involved placing water tanks and transformers at basements and at high levels, as required and applicable Tall buildings.
The System Hydraulics:Static pressure at any point is proportional to the height of the water above it, remembering that pressure acts equally in all directions. In a pipe work system one can imagine the vertical pipe rise as effectively a column of water where the static pressure acting in all directions at the bottom of that pipe is proportional to the height of water above.
Final calculation of the pressure in a system must add this static pressure to the dynamic pressure created by the circulating pump as it overcomes the frictional resistances within the pipe work system. Technical spaces at specific levels of the tower allow hydraulic separation of the water systems which allows these pressures to be controlled.
- The pressure in a pipe work system must be within the safe operating pressure of the equipment and components used. Standard equipment and components are generally designed to operate at a maximum of 16 bar using PN16 pipe work and fittings.
- Higher pressure rating components are available but the cost of these are high and there are safety implications involved in the construction and maintenance of high pressure systems, this includes the risk of the wrong component being installed if different component pressure ratings are used on the same site.