E - PAPER

CURRENT MONTH

LAST MONTH

VIEW ALL
  • HOME
  • NEWS ROOM
  • COVER STORY
  • INTERVIEWS
  • DRAWING BOARD
  • PROJECT WATCH
  • SPOTLIGHT
  • BUILDING BLOCKS
  • BRAND SYNC
  • VIDEOS
  • HAPPENINGS
  • E-MAGAZINE
  • EVENTS
search
  1. Home
  2. ALLIED

NHAI Strict Action: Suspends Contractor, Authority Engineer

NHAI Suspends Contractor, Authority Engineer & NHAI Official for Distressed Condition of Pavement on Amritsar-Jamnagar Corridor Section in Gujarat.

BY Realty+
Published - Saturday, 05 Jul, 2025
NHAI Strict Action: Suspends Contractor, Authority Engineer

An incident of distressed condition of Pavement Crust at some locations of 6–lane Sanchore – Santalpur Section of Amritsar – Jamnagar Economic Corridor (NH–754K) in Gujarat (Pkg-4 from Kilana to Santalpur) constructed by M/s CDS Infra Projects Limited (Contractor) was reported.

Total Length of Amritsar – Jamnagar Economic Corridor in Gujarat is 130 km (6-lane) and length of distressed pavement crust is in 1.35 km (3-lane) on LHS in 10 patches and 1.36 km (3-lane) on RHS in 05 patches.

The instant failure of pavement crust has been caused due to defects in Aggregate Inter Layer (AIL), Cement Treated Base (CTB) and poor drainage. The project is on Engineering Procurement & Construction (EPC) Mode and Completion Certificate is yet to be issued to the Contractor. Contractor will rectify the defects at his own risk & cost.

M/s CDS Infra Projects Limited has been debarred on immediate basis from participating in ongoing/ future bids for failure of the pavement crust.  Show Cause Notice for debarment and levy of monetary penalty of Rs.2.8 Cr. has also been issued.

Authority’s Engineer (M/s SA Infra in association with M/s Upham) has also been debarred on immediate basis from participating in ongoing/ future bids and Show Cause Notice for debarment has been issued. NHAI Project Director, Palanpur has been placed on suspension.

Expert Committees with Retd. and current Prof. of IIT-BHU, IIT-Delhi, IIT- Gandhinagar have been constituted for analysing the failure of Pavement Crust. Expert Committees are visiting the site, collecting samples to undertake tests and recommend detailed remedial measures to be taken. Contractor has already started the rectification work.

RELATED STORY VIEW MORE

Ludhiana to Commission Long pending C&D Waste Plant
NHAI Strict Action: Suspends Contractor, Authority Engineer
Ambuja Cements Ltd Pursues Focused Growth With Profitability

TOP STORY VIEW MORE

Samruddhi Mahamarg: Catalyst for Economic Transformation

As per Aayush Madhusudan Agrawal, Founder & Director Inspira Realty, the 701 km six-lane expressway is not just a road, but an economic corridor.

04 July, 2025

Malabar Gold & Diamonds Opens its Largest Manufacturing Site In Hyderabad

04 July, 2025

Navi Mumbai Major Milestone: Raheja Universal Rs 1,726 Cr Sales of Solaris Project

04 July, 2025

NEWS LETTER

Subscribe for our news letter


E - PAPER


  • CURRENT MONTH

  • LAST MONTH

Subscribe To Realty+ online




Get connected with us on social networks!
ABOUT REALTY+

Started in 2004, Realty+, an exchange4media group publication is one of the most respected real estate magazines in India with offices in Delhi, Mumbai and Bengaluru.

Useful links

HOME

NEWS ROOM

COVER STORY

INTERVIEWS

DRAWING BOARD

PROJECT WATCH

SPOTLIGHT

BUILDING BLOCKS

BRAND SYNC

VIDEOS

HAPPENINGS

E-MAGAZINE

EVENTS

OTHER LINKS

TERMS AND CONDITIONS

PRIVACY-POLICY

COOKIE-POLICY

GDPR-COMPLIANCE

SITE MAP

REFUND POLICY

Contact

Mediasset Holdings 3'rd Floor, D-40, Sector-2, Noida (Uttar Pradesh), Pincode - 201301

tripti@exchange4media.com
realtyplus@exchange4media.com

+91 98200 10226


Copyright © 2024 Mediasset Holdings.
Rental Mobil bandung,Sewa Mobil Bandung, Rental bandung, Sewa Mobil, Jual Mesin Antrian, Harga Mesin Antrian, Mesin Antrian Murah, Jual KIOSK,Mesin Antri, Berita Terkini, Info Bray,Info Tempat Wisata,Portal Berita,Jasa Website