E - PAPER

CURRENT MONTH

LAST MONTH

VIEW ALL
  • HOME
  • NEWS ROOM
  • COVER STORY
  • INTERVIEWS
  • DRAWING BOARD
  • PROJECT WATCH
  • SPOTLIGHT
  • BUILDING BLOCKS
  • BRAND SYNC
  • VIDEOS
  • HAPPENINGS
  • E-MAGAZINE
  • EVENTS
search
  1. Home
  2. News/Views

Average Large Residential Project Completion Time Down 20%

Average Large Residential Project Completion Time Down 20%

BY Realty Plus
Published - Monday, 15 Jul, 2024
Average Large Residential Project Completion Time Down 20%

Avg. time to complete residential projects of 500+ units in top 7 cities down to 4.9 years from H1 2014 - H1 2024 compared to 6.1 yrs. in 2010-2019 period

Chennai saw highest reduction of 36% in completion time, from 5.6 years in 2019 to 3.6 years in H1 2024; in Bengaluru & Hyderabad, completion time down to 4.8 & 4.2 years respectively. NCR saw a significant 25% reduction - from 7.2 years in 2019 to 5.4 years in H1 2024. In MMR, average completion time reduced to 5.2 years in H1 2024 from 6.5 years in 2019 - a reduction of 20%.

In Kolkata, homebuyers’ wait for large projects longest at 5.7 years with a just 10% reduction from 6.3 years in 2019. For smaller projects (100-500 units), top 7 cities avg. wait time reduced to 4.0 years in H1 2024 from 4.9 years in 2019

In what can be seen as a combined effect of RERA, modernisation of construction technology, and the increasing market share of large and listed developers, the last decade (2014-H1 2024) has seen homebuyers’ wait for possession in large under-construction projects in the top 7 cities reduce to 4.9 years, from 6.1 years in the 2010-2019 period.All projects launched and completed between 2010-2019 and 2014-H1 2024 in the top 7 cities were analysed in the study, and were further segregated into developments with less than 500 units larger ones with over 500 units.

When it comes to completing large projects, the top southern cities were markedly ahead of their northern, western, and eastern counterparts. For all large projects launched and completed between 2014 and H1 2024, the average completion time was lowest in Chennai with 3.6 years, while Hyderabad and Bangalore clocked in at 4.2 and 4.8 years respectively.It is noteworthy that at 36%, Chennai has the highest reduction of construction time among the top 7 cities, despite incessant rains during the monsoon season causing major challenges. The average time taken to complete smaller projects of less than 500 units in the top 7 cities was 4.0 years, and 4.9 years for large projects of >500 units each.

In Kolkata, large projects launched and completed between 2014 to H1 2024 took the longest average time to complete, at 5.7 years. In MMR, it took an average of 4.7 years to complete small projects, and around 5.2 years for large projects.

In Pune, the average project completion time was 4.3 years for small projects, and 5.4 years for large ones. In NCR, homebuyers waited an average of 4.7 years for small projects and 5.4 years for large ones. In Chennai and Hyderabad, the average completion time for small projects was 3 years and 3.1 years respectively, and 3.6 and 4.2 years for large projects, respectively. In Bangalore, it was 3.5 years for small projects and 4.8 years for large ones.

RELATED STORY VIEW MORE

Parminder Singh Joins Realistic Realtors As CTO & COO
Tribeca Developers Appoints Dharam Mehta to Lead Their New “Tribeca Estates” Venture
Modernizing Mumbai: Rebuilding the Colonial Infrastructure

TOP STORY VIEW MORE

HC Relief to WTCA on Trademark Row

WTCA expressed gratification for the High Court of Delhi recognizing that the Bhalla Group of Companies was continuing to infringe on its world-famous brands.

09 May, 2025

Beyond Chatbots: Changing Real Estate Customer Conversations

09 May, 2025

Instant, Legal Access to U.S. Property Equity Market for Indian Investors

09 May, 2025

NEWS LETTER

Subscribe for our news letter


E - PAPER


  • CURRENT MONTH

  • LAST MONTH

Subscribe To Realty+ online




Get connected with us on social networks!
ABOUT REALTY+

Started in 2004, Realty+, an exchange4media group publication is one of the most respected real estate magazines in India with offices in Delhi, Mumbai and Bengaluru.

Useful links

HOME

NEWS ROOM

COVER STORY

INTERVIEWS

DRAWING BOARD

PROJECT WATCH

SPOTLIGHT

BUILDING BLOCKS

BRAND SYNC

VIDEOS

HAPPENINGS

E-MAGAZINE

EVENTS

OTHER LINKS

TERMS AND CONDITIONS

PRIVACY-POLICY

COOKIE-POLICY

GDPR-COMPLIANCE

SITE MAP

REFUND POLICY

Contact

Mediasset Holdings 3'rd Floor, D-40, Sector-2, Noida (Uttar Pradesh), Pincode - 201301

tripti@exchange4media.com
realtyplus@exchange4media.com

+91 98200 10226


Copyright © 2024 Mediasset Holdings.
Rental Mobil bandung,Sewa Mobil Bandung, Rental bandung, Sewa Mobil, Jual Mesin Antrian, Harga Mesin Antrian, Mesin Antrian Murah, Jual KIOSK,Mesin Antri, Berita Terkini, Info Bray,Info Tempat Wisata,Portal Berita,Jasa Website