E - PAPER

CURRENT MONTH

LAST MONTH

VIEW ALL
  • HOME
  • NEWS ROOM
  • COVER STORY
  • INTERVIEWS
  • DRAWING BOARD
  • PROJECT WATCH
  • SPOTLIGHT
  • BUILDING BLOCKS
  • BRAND SYNC
  • VIDEOS
  • HAPPENINGS
  • E-MAGAZINE
  • EVENTS
search
  1. Home
  2. Realty Spotlight

Kundan Green Energy To Develop New Hydro Project In Sikkim

Kundan Green Energy To Develop New Hydro Project In Sikkim

BY Realty Plus
Published - Tuesday, 05 Mar, 2024
Kundan Green Energy To Develop New Hydro Project In Sikkim

Kundan Green Energy announced its mandate to develop a greenfield hydropower plant at Rellichu in Sikkim. The Government of Sikkim has awarded the project to Kundan Green Energy in continuation of the company’s record of executing hydropower projects on best-in-class standards, committed time-frames and optimal results. To be completed in 2026, the Rellichu hydropower project will generate 21 MW of power and add very substantially to Sikkim’s energy and developmental agenda. Once commissioned, the Rellichu project will take the combined hydropower capacities of Kundan Green Energy to 125 MW from the present 104 MW.

Speaking on the occasion, Udit Garg, Director, Kundan Green Energy said “The Northeast accounts for 40% of India’s hydropower potential. Of this, Sikkim’s hydropower potential is assessed at 8000 MW peak with a firm base of 3000 MW. With as many as 29 approved hydropower projects in various stages of development, and a 55 MW small hydropower installed capacity, Sikkim has vast potential to generate hydroelectricity. We are enthused to partner with the Government of Sikkim to realize the state’s hydropower potential along best practices.”

With four operating projects totalling 35 MW (which are being enhanced in capacities), in the state of Sikkim at Lower Lagyap, Meyong Chu, Kalex Khola, and Rabum Chu, besides two upcoming projects at Lower Meyong Chu and New Meyong Chu, Kundan Green Energy is a major energy partner to the state of Sikkim. A strong and growing presence notwithstanding, the company’s salient strength is execution excellence while the industry average in commissioning plants is 8-10 years, Kundan Green Energy’s mean average, including greenfield plants is a mere 4-5 years.

RELATED STORY VIEW MORE

Venkataramanan Associates Sets New Benchmarks In People-Centric Workspaces
Open Atelier Designed Clubhouse Intersects Luxury & Leisure
Creative Designer Architects Create a Campus that Breathes

TOP STORY VIEW MORE

Samruddhi Mahamarg: Catalyst for Economic Transformation

As per Aayush Madhusudan Agrawal, Founder & Director Inspira Realty, the 701 km six-lane expressway is not just a road, but an economic corridor.

04 July, 2025

Malabar Gold & Diamonds Opens its Largest Manufacturing Site In Hyderabad

04 July, 2025

Navi Mumbai Major Milestone: Raheja Universal Rs 1,726 Cr Sales of Solaris Project

04 July, 2025

NEWS LETTER

Subscribe for our news letter


E - PAPER


  • CURRENT MONTH

  • LAST MONTH

Subscribe To Realty+ online




Get connected with us on social networks!
ABOUT REALTY+

Started in 2004, Realty+, an exchange4media group publication is one of the most respected real estate magazines in India with offices in Delhi, Mumbai and Bengaluru.

Useful links

HOME

NEWS ROOM

COVER STORY

INTERVIEWS

DRAWING BOARD

PROJECT WATCH

SPOTLIGHT

BUILDING BLOCKS

BRAND SYNC

VIDEOS

HAPPENINGS

E-MAGAZINE

EVENTS

OTHER LINKS

TERMS AND CONDITIONS

PRIVACY-POLICY

COOKIE-POLICY

GDPR-COMPLIANCE

SITE MAP

REFUND POLICY

Contact

Mediasset Holdings 3'rd Floor, D-40, Sector-2, Noida (Uttar Pradesh), Pincode - 201301

tripti@exchange4media.com
realtyplus@exchange4media.com

+91 98200 10226


Copyright © 2024 Mediasset Holdings.
Rental Mobil bandung,Sewa Mobil Bandung, Rental bandung, Sewa Mobil, Jual Mesin Antrian, Harga Mesin Antrian, Mesin Antrian Murah, Jual KIOSK,Mesin Antri, Berita Terkini, Info Bray,Info Tempat Wisata,Portal Berita,Jasa Website